A recent Pyromaitre success story involves the tempering of hydro-formed torsion tubes. The conventional process was a 60-minute continuous batch process with an incredible 1056 parts in-process.
The lean solution being delivered to three continents utilizes a 10-minute process with only 60 parts in-process. High speed processing provided the opportunity for single piece work flow, eliminating part fixtures and external fixture handling equipment, a simplified and more robust robotics program, and a significantly reduced capital investment.
Pyromaitre Inc. - 1081 Chemin Industriel - St.Nicolas, Quebec - G7A 1B3 - Canada
Copyright 2007 - 2008 Pyromaitre Inc. All rights reserved.